
October 2, 2024
The second construction phase at our plant near Plovdiv / Bulgaria was recently completed. Pictured top right.
Approx. 8,000 m² of additional assembly space for the final assembly of high-quality machine tools MADE IN EUROPE was created as well as storage space for spare parts as an additional logistics warehouse for Europe.
The building is fully air-conditioned and electrically climate-neutral.